A volumetric concrete mixer is a demountable unit that batches concrete on site, used standing in the yard and mounted on a lorry. If a guard is off or the chute meets an overhead line, who was trained and assessed on that unit, and where is it written down? PHW trains and assesses your operators on your own volumetric concrete mixer, on your own site.

Demountable volumetric (batched on site) concrete mixer units, used standing in the yard and mounted on a lorry. PHW covers fitting the unit to the lorry and taking it off, working static in the yard (loading the bins, yard traffic and pedestrians, water and power, wash-out), working from the lorry at the site you deliver to (position, chute and belt feed, barrows, working beside a pour), the batching controller and mix selection against the designer's specification, discharging to barrows, a concrete pump or formwork, wash-out and waste water, cement dust and skin protection, moving parts, guards and entanglement, and the daily check of the unit and of the lorry when mounted.
The duty to train and assess competence sits with the employer, under the Health and Safety at Work etc. Act 1974 section 2(2)(c) and PUWER 1998 regulation 9.
PUWER regulation 9 requires adequate health and safety training in the methods of use, the risks and the precautions to be taken, and the Approved Code of Practice and guidance L22, Safe use of work equipment, is the reference for it. PUWER regulations 8, 11, 12, 16, 17, 19, 20 and 22 apply to the information given to the operator, guarding, material ejected from the equipment, emergency stop controls, controls, isolation from sources of energy, stability and maintenance operations. Guards, lids and covers over the auger and delivery devices stay in place, and nobody reaches into a bin, hopper, chute or auger housing while the machine is running or could start.
Where the unit is lifted in being fitted to the lorry or taken off it, LOLER 1998 regulations 4, 6 and 8 apply: every lift is planned by a competent person, supervised and carried out safely, and nobody goes under the unit or between the unit and the lorry while it is lifted or lowered. Whether the unit's own legs or demount gear count as lifting equipment is for the employer's competent person to say.
COSHH 2002 regulation 7 applies to cement and dust, with waterproof gloves, boots high enough to keep cement out, eye protection and an eyewash at the pour. CDM 2015 regulation 15 covers supervision, instruction and site induction. Wash-out water that contains concrete is not put onto the ground or into a drain or watercourse, and the Environment Agency's RPS 287 covers waste water containing concrete in England.
HSE guidance GS6 on avoiding danger from overhead power lines applies at every set-up: treat a line as live until its owner confirms it is dead, manage the risk within 10 m of the nearest wire measured at ground level, and keep to the exclusion zones of 1 m for low voltage, 3 m for 11 kV and 33 kV, 6 m for 132 kV and 7 m for 275 kV and 400 kV. Road legality of the lorry and driver entitlement stay with the vehicle owner and the driver, who check with DVLA and DVSA.
The employer decides who is authorised to run each machine and keeps that decision on file. The certificate, unit credit, records and site evidence statement are the evidence behind it.
PHW trains and assesses your operators on your own volumetric concrete mixer, on your own site. In plain terms: the daily check of the vehicle and the mixer; planning the pour from the job sheet; positioning on firm level ground; looking for overhead lines and low structures; reversing with a signaller; the calibration record and mix selection; loading the bins; start-up and agreed signals; discharging to formwork, a slab, a path or barrows, and into a concrete pump hopper; guards, emergency stops and isolation; cement and skin protection; wash-out and waste water; securing the unit for the road; shutdown and records; emergencies; the yard part; fitting and removing the unit on the lorry; working from the lorry at the site; and the batching controller. The units on the certificate are listed below.
The operator gets certificates to show on site. You get the records for your file. Anyone can scan the QR code on a certificate to open the live record.
Up to four of your people assessed for competence in one day, on your own site and machines, with minimum downtime. Plus a written safe-system pack for each topic. Tell us how many people run your volumetric concrete mixer and your site postcode, and PHW comes back with a quote and dates.