Site batching of concrete and mortar: hand gauging, tilting drum and forced-action mixers, and silo and tub mortar. If a mix is guessed by the shovelful, or a hand goes into a turning drum, who was trained and assessed on that work, and where is it written down? PHW trains and assesses your own people on your own site.

Batching concrete and mortar on site: gauging cement, lime, sand, aggregate and water by volume in a gauge box or accurate measuring vessel, to the mix the designer or specifier specifies and the manufacturer declares, including cement, lime and sand mortar (compo). Setting up, operating, cleaning and isolating a tilting drum mixer and a forced-action mixer, and drawing mortar from a silo or tub. Plasticisers and other admixtures to the supplier's instructions.
The duty to train and assess competence sits with the employer, under the Health and Safety at Work etc. Act 1974 section 2(2)(c) and PUWER 1998 regulation 9.
PUWER 1998 regulation 9 requires every employer to ensure that all persons who use work equipment have received adequate training in the methods of use, the risks and the precautions to be taken. The Approved Code of Practice L22 (Safe use of work equipment) is the reference for the mixer. Regulation 11 requires effective measures to stop the movement of any dangerous part of machinery before any part of a person enters a danger zone, so the guards over the drive, gears, paddles and pan stay fitted. Regulation 19 requires a means of isolating the mixer from all its sources of energy, clearly identifiable and readily accessible, and regulation 22 covers equipment being constructed or adapted so that maintenance can be done while it is shut down.
Cement, lime and mortar are substances hazardous to health. COSHH 2002 regulation 12 requires suitable and sufficient information, instruction and training for anyone who may be exposed, and regulation 7 covers preventing or controlling that exposure. HSE guidance on cement says a serious burn or ulcer can rapidly develop if it is trapped against the skin, and that burns can develop without pain, so wet cement in a glove or boot is removed and washed off at once.
Other duties apply to the same job:
The mix is the designer's or specifier's, and the manufacturer's for factory mortars. The operator batches to it the same way every time, adds water only within the specified consistency, and never retempers mortar after its initial set.
The employer decides who is authorised to run each mixer and mortar supply and keeps that decision on file. The certificate, unit credit, records and site evidence statement are the evidence behind it.
PHW trains and assesses your own people on your own site. In plain terms: finding the mix in the designer's specification or the mortar manufacturer's instructions and keeping to it; the pre-use check and set-up of the mixer; storing cement, lime, sand and aggregate; gauging by volume in the gauge box or accurate vessel, including compo; adding water within the specified consistency; dosing admixtures to the supplier's instructions; operating the mixer; isolating and cleaning it; silo and tub mortar; protecting skin and eyes; controlling dust; handling bags and mixers; electrics and fumes; washout and waste; and curing and weather. The units on the certificate are listed below.
The operator gets certificates to show on site. You get the records for your file. Anyone can scan the QR code on a certificate to open the live record.
Construction and civils: the film, the cases and a one-minute check are one tap away.
The written pack for the same work is Concrete, cement and mortar.
Up to four of your people assessed for competence in one day, on your own site, with minimum downtime. Plus a written safe-system pack for each topic. Tell us how many people batch concrete or mortar on your site and your site postcode, and PHW comes back with a quote and dates.