PHW · Concrete

Concrete pump operator training

A concrete pump is a truck-mounted boom pump or a static pump with a pipeline, placing concrete through a delivery line and an end hose. If a blocked line, an overhead cable or a failed coupling goes wrong, who was trained and assessed on that pump, and where is it written down? PHW trains and assesses your operators on your own concrete pump, on your own site.

Scope

The concrete pump: a truck-mounted boom pump and a static pump with a pipeline. Both are assessed on setting up, the pipeline and end hose, priming, pumping, blockages, clean-out and shutdown. Any site where concrete is pumped to the pour.

Construction: watch the film, read the trade page or take the one-minute check.

The legal position

The duty to train and assess competence sits with the employer, under the Health and Safety at Work etc. Act 1974 section 2(2)(c) and PUWER 1998 regulation 9.

PUWER regulation 9 requires every employer to make sure that everyone who uses work equipment has received adequate training for health and safety, including the methods of use, the risks and the precautions to be taken. The Approved Code of Practice and guidance L22, Safe use of work equipment, is the training reference. CDM 2015 regulation 15 adds that a contractor must not appoint a person to work on a construction site unless that person has, or is obtaining, the necessary skills, knowledge, training and experience for the tasks allocated.

The industry good practice guide states that the placing boom is not lifting equipment under LOLER, so the pump is inspected under PUWER regulation 6, at suitable intervals and each time exceptional circumstances occur that could jeopardise its safety.

PUWER regulation 11 requires measures to prevent access to dangerous parts before any part of a person enters a danger zone, which is why the hopper grille stays closed during pumping. Regulation 19 requires a means of isolating the pump from its sources of energy, clearly identifiable and readily accessible.

HSE guidance GS6 says to assume that an overhead power line is live until its owner confirms it is dead, and to manage the risk where work is within 10 m, measured at ground level horizontally from below the nearest wire. It gives minimum exclusion zones of 1 m for a low voltage line, 3 m for 11 kV and 33 kV, 6 m for 132 kV and 7 m for 275 kV and 400 kV. They are minimums, and the line owner advises the safe clearance for work with a boom. Electricity at Work Regulations 1989 regulation 14 forms part of the legal basis for this work.

The manufacturer's instruction manual sets the limits specific to the pump and the job: the wind limit for the boom, the maximum end hose length, the outrigger loads and spreader plate sizes, the pipeline pressure and the priming method. The hirer checks that the site wind is within the limit. Hard standing able to carry the loads the pump puts on it is provided by site management. Work at Height Regulations 2005 regulation 6 requires work at height to be avoided where it is reasonably practicable to do the work otherwise.

CDM 2015 regulation 28 requires suitable and sufficient steps to warn anyone at risk from the movement of a vehicle, and HSE guidance HSG144 records that reversing causes a third of fatal transport accidents in construction, so mixer lorry reversing is controlled with a marshaller. COSHH 2002 regulation 7 applies to wet cement, which is highly alkaline and can cause a serious burn or ulcer if trapped against the skin.

Employer duty

The employer decides who is authorised to run each machine and keeps that decision on file. The certificate, unit credit, records and site evidence statement are the evidence behind it.

What is assessed

PHW trains and assesses your operators on your own concrete pump, on your own site. In plain terms: the pre-use inspection, documents and defect reporting; assessing the site, ground and wind; setting the outriggers on spreader plates and levelling the pump; working safely near overhead power lines; laying and inspecting the delivery pipeline, couplings and end hose; briefing the pour gang and agreeing signals; keeping the danger zone clear; priming the line and pumping with the hopper grille closed; preventing and clearing blockages; cleaning out with water first; protecting health from wet cement, noise and fumes; moving the pump on site; and shutting down, isolating and securing it. The units on the certificate are listed below.

  1. Health, Safety and Security at Work
  2. Prepare the Concrete Pump: Roles, Documents, Pre-use Checks and Defect Reporting
  3. Assess the Site, Ground and Wind and Position the Pump
  4. Set Up the Pump: Outriggers, Spreader Plates and Levelling
  5. Work Safely Near Overhead Power Lines and Other High-Reach Plant
  6. Lay and Inspect the Delivery Pipeline, Couplings and End Hose
  7. Work with the Pour Gang, Signaller and Mixer Driver: Signals, Hopper Level and Danger Zone
  8. Prime the Line and Pump Concrete: Hopper, Grille and Controls
  9. Prevent, Recognise and Clear Blockages Safely
  10. Clean Out the Pump and Line: Water First, Washout and Waste
  11. Protect Health: Wet Cement, Noise, Fumes and Manual Handling
  12. Move and Position the Pump on Site (Truck-mounted Boom Pump and Static Pump)
  13. Shut Down, Isolate, Stow and Secure the Pump

Some points are safety critical and are checked every time: every coupling pinned and every end hose strapped or chained before pumping, the delivery line treated as pressurised and never opened under pressure, the hopper grille closed during pumping with nobody working inside the hopper, and the pump and boom isolated whenever left unattended.

What the operator and the employer receive

The operator gets certificates to show on site. You get the records for your file. Anyone can scan the QR code on a certificate to open the live record.

  1. Award certificate
  2. Unit credit certificate, covering the units listed above
  3. Theory test record
  4. Practical assessment record
  5. Site evidence statement for site management, setting out who was assessed, on what, and the decision reached
  6. Live verification page
  7. QR code on the certificate: scan it with a phone and the live record opens

Get a quote

Up to four of your people assessed for competence in one day, on your own site and machines, with minimum downtime. Plus a written safe-system pack for each topic. Tell us how many people run your concrete pump and your site postcode, and PHW comes back with a quote and dates.