A tracked 360 (slew) excavator, over 12 tonnes up to 33 tonnes: the larger machine, with a wider counterweight swing and a heavier load on the ground and on trench edges. If a trench edge gives way, or someone is struck inside the slew radius, who was trained and assessed on that machine, and where is it written down? PHW trains and assesses your operators on your own 360 excavator, on your own site.

Tracked 360 (slew) excavators, over 12 tonnes up to 33 tonnes
PHW trains and assesses your operators on your own 360 excavator, on your own site. In plain terms: can the operator inspect the machine and its undercarriage, assess the ground, slope and work area, travel and track across open, confined and sloped ground, excavate and load to line and level, backfill, spread and grade, load a transport vehicle, fit and use attachments, couple the quick hitch and carry out the pin check, work safely near overhead lines and people, load and unload the machine on a road vehicle, deal with a fault or a rollover scenario, and park, refuel, shut down and report. Lifting is assessed on a machine that has the manufacturer's permission for lifting, marked lifting points, a current thorough examination and, over one tonne, a rated capacity indicator and check valves. The units on the certificate are listed below.
Safety-critical points covered include the stand-off from an open excavation set by the competent person's plan, keeping people out from below and within reach of the bucket, loading a road vehicle without slewing over the cab, quick hitch engagement and retaining pin checks every time an attachment is fitted, every overhead line treated as live, the slew radius danger area with the counterweight and exclusion zone, and the seat restraint worn where fitted.
The operator gets certificates to show on site. You get the records for your file. Anyone can scan the QR code on a certificate to open the live record.
The duty to train and assess competence sits with the employer, under the Health and Safety at Work etc. Act 1974 section 2(2)(c) and the Provision and Use of Work Equipment Regulations 1998 (PUWER) regulation 9.
PUWER regulations 4, 5, 8, 9, 25, 26 and 28 are supported by the Approved Code of Practice L22, safe use of work equipment, which sets out the training regulation 9 requires. Training on a smaller excavator is not enough: a machine over 12 tonnes reaches further, swings its counterweight wider and loads the ground and edges harder, so the operator needs familiarisation on that machine before written authorisation.
On a construction site, the Construction (Design and Management) Regulations 2015 regulation 22 covers excavations. The stand-off from the edge of an excavation comes from the competent person's plan, and is greater for a heavier machine and for poor or wet ground. A supported or battered excavation is inspected by a competent person at the start of every shift, after anything that could affect it, and after any fall of material. Regulation 25 covers energy distribution installations and underground services: HSE guidance HSG47 requires the plans to be read, the services located and marked, and trial holes dug by hand where needed. HSE guidance GS6 covers work near overhead power lines, which are treated as live because electricity can flash over to plant that does not touch the line. Regulations 27 and 28 cover traffic routes and vehicles, with HSE guidance HSG144 on the safe use of vehicles on construction sites.
Where the excavator is used for lifting, the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) regulations 4, 6, 7, 8 and 9 apply, with the Approved Code of Practice L113. The manufacturer must permit lifting, the machine must have dedicated lifting points marked with safe working loads, and it must have been thoroughly examined. Where lifting capacity is above one tonne, the machine needs a rated capacity indicator and boom check valves. Under regulation 8, every lift is planned by a competent person and appropriately supervised.
HSE industry guidance on quick hitches applies to every attachment change: operators are trained on the hitch fitted to the machine, both pins are engaged and the manufacturer's retaining pin or bar is in place.
The employer decides who is authorised to run each machine and keeps that decision on file. The certificate, unit credit, records and site evidence statement are the evidence behind it.
Up to four of your people assessed for competence in one day, on your own site and machines, with minimum downtime. Plus a written safe-system pack for each topic. Tell us how many people run your 360 excavator and your site postcode, and PHW comes back with a quote and dates.