A breeze block wall that had been backfilled before the mortar had properly set collapsed into an excavation, crushing a steel-fixer against the concrete floor below. The company had no temporary works procedure and had failed to design, coordinate or properly manage the temporary works.
Injuries: Life-changing injuries requiring airlift evacuation by fire and rescue services.
Regulations 13(1) and 19(1) of the Construction (Design and Management) Regulations 2015
“The correct design and execution of temporary works is an essential element of risk prevention in construction.”
Follow a proper temporary works procedure and let mortar cure before backfilling.